Overnight is the default because nobody could prove ground was safe. We check every order against its lane and that week's forecast, and ship ground wherever your packout holds.
Illustrative. Decisions are re-run per order as the forecast changes.
Pick a product, box, liner and gel. See where ground holds, which service it takes where it doesn't, and where a lower-cost packout would do the same job.
Uses Keep It Cool model results for this week's forecast and carrier transit times. Each choice stands for a typical packout, not your exact packaging.
We model it in days and confirm it with live sensor shipments. When a supplier or lane changes, we re-qualify it in days, and you have the record for your next audit.
A chamber study tests one packout in one condition and freezes the result. We qualify it on your real lanes, with real shipments, and keep qualifying it.
Enter box, liner and coolant properties. The thermal model runs every lane across the year and flags where the packout holds and where it does not.
Low-cost NFC sensors ride along in real orders. Traces land in your qualification dashboard as they arrive and are checked against the model.
New coolant block, new liner supplier, new carrier service: the model re-runs in days and the dashboard shows what still holds. Export the data for your own file.
Refrigerated line haul, a new coolant block, a liner supplier changing spec, a second DC, a substitute during a shortage: each one means re-qualifying. At months per packout, most of those changes never happen.
No. We model the packout you already use and check the model against your existing chamber data. Lanes where it holds go ground. The rest stay overnight.
Every decision is logged with its inputs, route forecast, predicted temperature curve and any sensor trace. Export it straight into your file.
Every order is re-checked against that week's forecast. Lanes that would not hold go overnight or get an extra block, automatically.
Not to start. Send us your packout specs and lanes. Connecting your order system comes later, when you want every shipment decided automatically.
Send your packout specs and a list of lanes. In days you get the lanes that hold on ground, what that saves, and a sensor plan to confirm it.